Blogs
You are here: Home » Blogs

three phase energy and power meter

These articles are all highly relevant three phase energy and power meter. I believe this information can help you understand three phase energy and power meter's professional information. If you want to know more, you can contact us at any time, we can provide you with more professional guidance.
  • Energy Consumption Monitoring System for Buildings in Shanghai GM Cadillac

    2020-11-24

    The project is located in Pudong, Shanghai. The system is built for real-time online monitoring of electricity, industrial water, cold water, hot water, natural gas, compressed air and so on in paint workshop, metering and analyzing of the above-mentioned energy consumption in accordance with the production line and process, production team and use, to achieve energy consumption assessment and refined management. Read More
  • 200MW Solar Cell Industrial Park Project in India

    2020-11-24

    The project of Red Sun Optoelectronics Technology Co., Ltd. is located in Chennai, India. It requires real-time monitoring of electricity consumption and statistical analysis of electric energy. Also, it needs to real-time monitor and alarm cable temperature and residual leakage to avoid the fire. Besides, in order to ensure the fire fighting equipment works normally, power supply should be monitored. Read More
  • High-voltage Test Computer Detection and Test Operating System in PT. XD SAKTI INDONESIA

    2020-11-24

    The project is located in the development zone of Jakarta, Indonesia. It is required to carry out various experiments such as no-load test, load test and induction withstand voltage test on the transformers and record the experimental process data and results. Read More
  • Boeing 737 Delivery Center Factory Project

    2020-11-24

    The Boeing 737 Delivery Center Factory Project requires real-time monitoring of electricity consumption and statistical analysis of electric energy. Also, it needs to real-time monitor and alarm cable temperature and residual leakage to avoid the fire. Besides, in order to ensure the fire fighting equipment works normally, power supply should be monitored. Read More